03Port to Ship Method

Gas Trail on LNG carrier

BY KOGAS
  • Gas trial operation on LNG carrier that was built by Korean shipbuilder using the KOGAS LNG terminal for last 30 years.

  • Conducted Gas trial operation on about 20 to 40 LNG carrier per year for 3 shipbuilders, supplied about 250 thousand tons for last 30 years.

BY KOLB
  • Supplied PTS LNG bunkering using LNG terminal of KOGAS (January 2021 ~ )
공백

Supply LNG bunkering for Gas trail operation during the LNG carrier building

PTS vessel trail operation (January 2021)